CR 108 bridge: south-side railing reinstalled

The railing has been reinstalled on the County Road 108 bridge near Carbondale.

The railing on the south side of the County Road 108 (Thompson Creek Road) bridge near Carbondale has been reinstalled, and all forms from the new concrete curb have been removed. Paving work is slated for next week.

The pedestrian walkway remains open over the CR 108 bridge, though temporary delays may occur to ensure public safety near welding, active machinery, and equipment.

Detour routes for the Glenwood Springs side include County Road 109 to Highway 82 near Ironbridge/Westbank; or Dry Park Road to County Road 117 – Four Mile to Glenwood Springs. Carbondale traffic is recommended to use highways 133 and 82.

Email updates are available from online posts at garfieldcountynews.org and here at garfieldcountyco.gov, the main county website.

CR 108 bridge: south-side railing reinstalled

CR 108 bridge: south-side curb poured

South-side curb concrete has been poured for the County Road 108 bridge near Carbondale, CO.

The new concrete curb has been poured on the south side of the County Road 108 (Thompson Creek Road) bridge near Carbondale. Once the concrete cures, the forms will be removed and the railing will be reinstalled, likely on Wednesday.

The pedestrian walkway remains open over the CR 108 bridge, though temporary delays may occur to ensure public safety near welding, active machinery and equipment.

Detour routes for the Glenwood Springs side include County Road 109 to Highway 82 near Ironbridge/Westbank; or Dry Park Road to County Road 117 – Four Mile to Glenwood Springs. Carbondale traffic is recommended to use highways 133 and 82.

Email updates are available from online posts at garfieldcountynews.org or visit garfieldcountyco.gov, the main county website.

CR 108 bridge: south-side curb poured

CR 108 bridge: concrete decking work completed

All concrete work on the new decking of the CR 108 bridge near Carbondale is complete.

New concrete has been poured over the decking of the County Road 108 bridge near Carbondale, and all welding work is complete. The new forms are built, and crews are now waiting on rebar to arrive, after which they will put the forms together. Plans are to pour the south-side curb early next week.

The pedestrian walkway remains open over the CR 108 bridge, though temporary delays may occur to ensure public safety near welding, and active machinery and equipment.

Detour routes for the Glenwood Springs side include County Road 109 to Highway 82 near Ironbridge/Westbank; or Dry Park Road to County Road 117 (Four Mile) to Glenwood Springs. Carbondale traffic is recommended to use highways 133 and 82.

Email updates are available from online posts at garfieldcountynews.org or visit garfieldcountyco.gov, the main county website.

CR 108 bridge: concrete decking work completed

CR 108 bridge: steel decking completed

Steel decking has been replaced on the County Road 108 (Thompson Creek Road) bridge over the Crystal River near Carbondale.

The new steel decking has been placed across the entire County Road 108 (Thompson Creek Road) bridge near Carbondale. Crews are now pouring concrete over the south-side steel, after which they will begin framing the curb on the south side of the bridge.

The pedestrian walkway remains open over the CR 108 bridge, though temporary delays may occur to ensure public safety near welding, active machinery, and equipment.

Detour routes for the Glenwood Springs side include County Road 109 to Highway 82 near Ironbridge/Westbank; or Dry Park Road to County Road 117 (Four Mile) to Glenwood Springs. Carbondale traffic is recommended to use highways 133 and 82.

Email updates are available from online posts at garfieldcountynews.org and here at garfieldcountyco.gov, the main county website.

CR 108 bridge: steel decking completed